home
***
CD-ROM
|
disk
|
FTP
|
other
***
search
/
Internet Info 1994 March
/
Internet Info CD-ROM (Walnut Creek) (March 1994).iso
/
inet
/
ietf
/
chassis
/
chassis-minutes-92jul.txt
< prev
next >
Wrap
Text File
|
1993-02-17
|
4KB
|
128 lines
Editor's Note: Minutes received 8/8
CURRENT_MEETING_REPORT_
Reported by Bob Stewart/Xyplex
Minutes of the Chassis MIB Working Group (CHASSIS)
The purpose of this meeting was to try to get the Chassis MIB Working
Group started/restarted.
All sorts of events have conspired to detract from efforts to get it
started. A major contributor from Cabletron got reassigned. Another
major contributor and one of the co-Chairs has been tied up with other
standardization efforts such as (SMP). The other co-Chair has been ill
for nearly a month but we are pleased to hear he is better. Finally,
the members of the non-Working Group seem to think that the mailing list
is a read-only object.
The Group spent time reassessing the interest in and commitment to this
work with the intention of pulling the plug if appropriate (though
everyone hoped it would not be necessary). In addition attempts were
made to put together a new time-action-plan for the work.
This was a short meeting. There was nothing to be read or said.
The Charter was reviewed as well as the work done, noting that there
were only thirteen messages on the mailing list since our first meeting.
o The Group was supposed to have Chassis MIB submissions and
synthesize a proposal. Nothing had been done, and it still needs
doing.
o The Group was supposed to get power supply submissions. It got 1
or 2. More needs to be done.
o Nothing was done on the Aggregate MIB.
Time was spent reassessing interest, and the following conclusions were
made.
o Interest remains, though perhaps at slightly lessened level. The
meeting well attended.
o The Cabletron implementation has moved in the direction of Keith &
Donna's proposal.
The following plans were made.
o For Chassis MIB: authors are to post original documents, or a new
one within a few weeks. Cabletron proposal could be updated.
1
Originals are in archive.
o For Power Supply MIB: MIBs are to be submitted in a week, and about
ten are expected.
o The Aggregate MIB has been placed on the back burner.
Attendees
Andy Bierman bierman@davidsys.com
Natan Borshansky natanb@turisc.timeplex.com
Steve Bostock steveb@novell.com
Lida Carrier lida@apple.com
Jeffrey Case case@cs.utk.edu
Chris Chiotasso chris@artel.com
Dave Cullerot cullerot@ctron.com
Cathy Cunningham cmc@microcom.com
Michael Davison davison@cs.utk.edu
David Engel david@ods.com
Fred Engel engel@concord.com
Bill Fardy fardy@ctron.com
Shawn Gallagher gallagher@quiver.enet.dec.com
Pria Graves priag@nsd.3com.com
Ronald Jacoby rj@sgi.com
Mark Kepke mak@cnd.hp.com
Zbigniew Kielczewski zbig@eicon.qc.ca
Deidre Kostick dck2@sabre.bellcore.com
Cheryl Krupczak cheryl@cc.gatech.edu
David Lindemulder dcl@mtung.att.com
Kim Mayton mayton@wg.com
Keith McCloghrie kzm@hls.com
Donna McMaster mcmaster@synoptics.com
Edwin Mier mier@tigger.jvnc.net
David Minnich dwm@fibercom.com
Lynn Monsanto monsanto@sun.com
Paul Moran Paul_Moran@3com.com
Patrick Mullaney mullaney@ctron.com
Rina Nathaniel rina!rnd!rndi@uunet.uu.net
John Payne jop@wang.com
David Perkins dperkins@synoptics.com
Ed Reeder EREEDER@ralvm12.vnet.ibm.com
Sam Roberts sroberts@farallon.com
Guenter Roeck roeck@conware.de
Dan Romascanu dan@lannet.com
Michael Sapich sapich@conware.de
Jim Scott scott@kali.enet.dec.com
Bob Stewart rlstewart@eng.xyplex.com
Bruce Taber taber@interlan.com
Mark Therieau markt@python.eng.microcom.com
Chuck Townsend townsend@ctron.com
Stephen Tsun snt@nsd.3com.com
David Waitzman djw@bbn.com
2
Kiho Yum kxy@nsd.3com.com
Joseph Zur zur@fibhaifa.com
3